5x10 Frame Tent PVC WITH SIDES

/

INSTALLATIONS OF TENTS IN PARKING LOTS OR TARRED SURFACES:

* For installations in parking lots or on tarred surfaces, water ballasts will be      required.
* If the area has paving that allows for lifting and peg installation, water              ballasts will not be necessary.
* Please note: Water ballasts are not included in standard quotations and will    incur an additional charge if required.
* When water ballasts are needed, a high-pressure water tap must be                available within 50 meters of the installation site.
* Filling each water ballast may take a minimum of 2 hours, depending on          water pressure, and must be completed prior to erecting the tent.

ANCHORING TENTS TO BUILDING AND STRUCTURES:

* A full site plan, clearly indicating all underground electrical cables, water          pipes, sewers, and/or sprinkler systems, must be provided at least 7 days        before the tent installation if pegs are to be used as anchor points.
* Elegance Events & Décor is not liable for any damage resulting from the          absence of this information.
* An authorized site manager must be present to sign off on the installation      prior to any pegs being inserted.
* Please be aware: Pegs are driven deep into the ground and may cause            damage to gardens or lawn areas.
* Elegance Events & Décor cannot be held responsible for such damage as it    forms part of our standard and safe installation process.